«We took the ex works price, it is the lowest»
How it shows up
Compared with the others the price looks excellent. Then the costs that were not in the quotation arrive and the advantage evaporates, along with weeks of time.
Why it happens
The incoterm is not an administrative detail: it decides who does what, who pays for what and, above all, where the risk passes. An ex works price and a price with the goods loaded on board are not comparable, and whoever puts them in front of you knows that perfectly well.
The signal to catch
Different quotations on different incoterms, placed in the same table.
What to do
Normalise every quotation to the same incoterm before comparing them, and choose the incoterm on the basis of who really controls that leg of the journey, not on the basis of which figure looks lower.
The clusters where this mistake costs most
The sector does not change the nature of the mistake, it changes what you pay when it happens. In these clusters the entry comes up more often: if you are looking at one of these areas, read the signal again before you leave.
Other entries in the same family
The other entries gathered under Inspection and loading. Different mistakes, same root.
Where this entry comes from
We would rather state what we do not know than round it off.
- How it is built
- From the field: what we have seen inside factories and when containers were opened, and what clients told us.
- Why there are no names
- Entries are anonymised. Company, supplier and personal names stay out of it, out of respect for the confidentiality of those who told us their story: the judgement can be shared, the name cannot.
- How it grows
- The Register gets longer with every trip. When an entry is added, or when an entry changes because a rule has changed, the date below moves.
- Entry updated on
- 03/08/2026
An entry in the Register is not advice on your case. It describes a recurring mechanism and says where to start looking: checking your product, your contract and your supplier still has to be done, and it has to be done with someone who can sign off on it.
We don't take on every project that comes our way
We take on one project at a time, because we go in person and we travel with you. Before we talk about quotes, we check whether the project stands up, and if it doesn't, we tell you straight away.