Chaozhou
sanitary ceramics, daily-use porcelain
Complete supply chain from design to mould, highly specialised in sanitaryware and tableware.
- Sector
- Home and furniture
- Province
- Guangdong
- Nearest airport
- Jieyang Chaoshan Airport (SWA) 25 km, 40 minutes
- Reference trade-fair hub
- around 350 km from Guangzhou, 2 hours by high-speed train
What is actually made here
a European buyer finds two distinct supply chains in the same area: sanitaryware (WC pans, washbasins, ceramic taps, smart toilets with integrated bidet) concentrated mainly in Chao'an, and tableware, table and gift porcelain concentrated in Fengxi. The quality range runs from budget product for mass retail to medium to high-end pieces for hotels and retail, with the capacity to follow European designs. Standard processes (moulding, machine glazing, decal application) are reliable and fast; fine hand painting and complex non-standard shapes require careful supplier selection and longer lead times. The metal taps that accompany ceramic sanitaryware are often subcontracted to Kaiping or Nanhai, so a "complete bathroom" order implies coordination across several clusters.
How the cluster is built
large vertically integrated groups (production, moulds, kilns, export logistics) coexist with thousands of small workshops and subcontractors specialising in single stages (forming, glazing, hand decoration, third firing). Automation has grown quickly: local sources indicate coverage of intelligent production lines above 65% in the sanitaryware segment, with 12 nationally recognised "green factories". Daily-use porcelain (tableware, giftware) remains more labour-intensive and fragmented than sanitaryware.
Size: around 4,000 companies, over 250,000 employees, annual output value around RMB 50 billion; 43% of Chinese sanitary ceramics in 2024
Typical order minimums
for standard ceramic tableware, typical MOQs start from a few hundred to 1,000 or 3,000 pieces per design and colour in small and medium factories, often negotiable by combining several references in the same container. For sanitaryware (WC pans, washbasins) MOQs are tied to tooling: a new dedicated mould requires orders in the hundreds or thousands of pieces to amortise the cost; on moulds already in the supplier's catalogue the MOQ drops considerably. Room for negotiation: high on catalogue products, low when an exclusive mould or decoration is required.
Second source: 100 to 200 pieces for sanitaryware, 500 to 1,000 pieces per design for tableware.
Mistakes we see repeated
first, confusing sanitaryware factories with tableware factories and assuming that one supplier covers both lines well, when in reality the equipment and the know-how are different. Second, underestimating quality control on thermal shock resistance and on the flatness of sanitaryware, a defect that only emerges at installation and not in a superficial visual inspection. Third, failing to check whether the supplier owns its glazing and firing line or subcontracts the third firing, which materially changes lead times and quality consistency.
- Not carrying out pre-shipment inspection for glaze defects (pinholes, black spots).
- Underestimating the need for drop-tested packaging for European e-commerce, resulting in heavy breakage.
In the Register of Mistakes
When not to visit or place orders
The Canton Fair (Guangzhou, April and October) has a pavilion dedicated to Fengxi and Chaozhou ceramics; a useful first point of contact with several suppliers in one place. Locally, a smart sanitaryware conference and fair is held in March at Chao'an (Chao'an Sanitary Ceramics Brand Hall). Avoid the weeks around Chinese New Year (late January to mid-February 2027, check the exact date year by year), when factories close for 2 to 3 weeks and response times lengthen both before and after.
Second source: Delays during the Canton Fair weeks (April/May and October/November) and shutdown for Chinese New Year (January/February).
The fairs that matter for this cluster
What we look at when we go
A cluster is not judged from a catalogue. On site we look at the tooling shop, the inspection logs, the spare-parts store and who answers when the owner is away. The nine phases of the method state what we deliver, and when.
How this page was built
We would rather state what we do not know than round it off.
- Verification status
- Specialisation confirmed by two independent sources. Size figures still need to be checked on site.
- First source
- Desk research on Chinese and international public sources: local statistical offices, industry associations, business press.
- Independent second source
- Cross-check with a second research system, August 2026. RMB 50 billion (500 亿 RMB) (2024) Open the source
- Page updated on
- 03/08/2026
None of these checks replaces a site visit. Distances and logistics hubs are indicative, order minimums vary by supplier and season, and Chinese public figures must be read with the original unit in mind: 亿 is 100 million, not a billion.
Other clusters worth the same trip
We don't take on every project that comes our way
We take on one project at a time, because we go in person and we travel with you. Before we talk about quotes, we check whether the project stands up, and if it doesn't, we tell you straight away.