«The price is fixed for the whole year, we put it in the order»

How it shows up

The unit price is locked in the annual order. A few months later the supplier asks for a revision, citing the rise in the cost of a raw material, and it is handled as an emergency to be dealt with case by case, each time with less bargaining power because the order is already in production.

Why it happens

A fixed price protects the buyer when raw materials fall and protects the supplier when they rise, but neither party says so openly during the negotiation. Without a clause linking the price to a verifiable index, every movement becomes a discussion to be had again from scratch, at the very moment when the supplier has the most leverage because production is already under way.

The signal to catch

A contract that sets a single stable price for products whose bill of materials contains a volatile raw material component (metals, oil-based plastics, some textiles), with no reference to an index.

What to do

Isolate the raw material share within the price breakdown and link it to a verifiable public index, leaving the processing and margin share fixed. The discussion moves from "how much" to "which index", and it is had once only, at the start.

Where this entry comes from

We would rather state what we do not know than round it off.

How it is built
From the field: what we have seen inside factories and when containers were opened, and what clients told us.
Why there are no names
Entries are anonymised. Company, supplier and personal names stay out of it, out of respect for the confidentiality of those who told us their story: the judgement can be shared, the name cannot.
How it grows
The Register gets longer with every trip. When an entry is added, or when an entry changes because a rule has changed, the date below moves.
Entry updated on
03/08/2026

An entry in the Register is not advice on your case. It describes a recurring mechanism and says where to start looking: checking your product, your contract and your supplier still has to be done, and it has to be done with someone who can sign off on it.

How it starts

We don't take on every project that comes our way

We take on one project at a time, because we go in person and we travel with you. Before we talk about quotes, we check whether the project stands up, and if it doesn't, we tell you straight away.