Danyang
eyewear, ophthalmic lenses
The largest eyewear distribution hub in Asia, a global reference point for ophthalmic lenses.
- Sector
- Other verticals
- Province
- Jiangsu
- Nearest airport
- Nanjing Lukou Airport (NKG), or Shanghai Pudong (PVG) 100 km, 1 hour 30 minutes
- Reference trade-fair hub
- about 220 km, 1.5 hours by high-speed train
What is actually made here
manufacturers of ophthalmic lenses (single vision, progressive, anti-reflective and blue light coatings), fewer frames (concentrated in Rui'an). Quality on standard lenses is high thanks to industrial scale, and lead times on custom prescriptions are short thanks to dedicated e-commerce platforms. Prices are low to medium on standard lenses, higher on special coatings. Easy: high volume orders of standard lenses. Difficult: guaranteeing traceability of the optical material (the declared refractive index) on mixed batches coming from several suppliers.
How the cluster is built
described as the largest eyewear distribution hub in Asia. Integrated supply chain from design to research and development to production, with a research institute dedicated to eyewear and a national product quality control centre. A mix of large lens manufacturers with automated lines for standard lenses and small laboratories for custom lenses and complex prescriptions.
Size: over 400 million pairs of lenses a year, around 70% of the Chinese total and half of world output
Typical order minimums
for standard lenses the MOQ is low or absent on single orders through B2B e-commerce platforms; for wholesale supply to a distributor the MOQ is in the order of thousands of pairs, and negotiable.
Second source: 500 to 1,000 pieces per model and colour on frames, far less on standard lenses
Mistakes we see repeated
first, checking the refractive index declared on the technical data sheet without testing the batch received: a lens with a lower index than declared is thicker and heavier than expected, but the defect goes unnoticed without measuring equipment. Second, assuming that the declared anti-reflective and anti-scratch coating lasts the same across all suppliers: coating quality varies a great deal and a poor coating costs markedly less than one with certified durability (verifiable with an abrasion test). Third, concentrating on the lens and neglecting to check the matching frame, often supplied by a different supplier (typically in Rui'an), with the risk of a quality mismatch between the two components of the finished product.
- Not independently verifying the authenticity of the manufacturer's CE or FDA certificates.
- Focusing on the design while accepting cheap hinges and small metal parts that break early.
In the Register of Mistakes
When not to visit or place orders
China (Danyang) International Optics Fair, a local event (exact month to be verified, historically in spring). Recommended period: to coincide with the local fair, or combined with a stop in Shanghai given how close it is by high-speed train.
Second source: February, Chinese New Year, with extended production shutdowns.
The fairs that matter for this cluster
What we look at when we go
A cluster is not judged from a catalogue. On site we look at the tooling shop, the inspection logs, the spare-parts store and who answers when the owner is away. The nine phases of the method state what we deliver, and when.
How this page was built
We would rather state what we do not know than round it off.
- Verification status
- Specialisation confirmed by two independent sources. Size figures still need to be checked on site.
- First source
- Desk research on Chinese and international public sources: local statistical offices, industry associations, business press.
- Independent second source
- Cross-check with a second research system, August 2026. RMB 12 billion (120 亿元) (2024) Open the source
- Page updated on
- 03/08/2026
None of these checks replaces a site visit. Distances and logistics hubs are indicative, order minimums vary by supplier and season, and Chinese public figures must be read with the original unit in mind: 亿 is 100 million, not a billion.
Other clusters worth the same trip
We don't take on every project that comes our way
We take on one project at a time, because we go in person and we travel with you. Before we talk about quotes, we check whether the project stands up, and if it doesn't, we tell you straight away.